MES has roots in paper: Frederick Taylor’s route clerks and instruction cards, described in 1903, and Walter Shewhart’s control chart in 1924. Machines got software with numerical control in 1952 and the Modicon 084 controller in 1968. Barcodes reached the checkout in 1974. AMR Research named the manufacturing execution system in the early 1990s, the trade group MESA listed its 11 functions in 1997, and the ISA-95 standard drew the levels in 2000.
- Manufacturing execution system (MES)
- Software that runs the shop floor between the plan and the machines: which job runs where, with what material and by whom, and what came off the line. The ISA-95 standard places it at level 3.
Watch the film
Narrated, about 7 minutes. Press Play. The voice is your browser’s own, so it sounds different on each device. Open full screen
The story
Today· Your shop
Where it starts
Somewhere in your shop right now, a job is moving. A traveler rides with it from the saw to the mill to inspection. Someone wrote down the hours. Someone else is asking where it is. The software built to answer that question has a name: the manufacturing execution system, or MES. This is the story of how the shop floor got its own software, and why so many shops still run on paper.
1881 to 1911· Midvale Steel
The route clerk
The paperwork came before the software. In the early 1880s, Frederick Taylor began timing work at Midvale Steel in Philadelphia. In his 1903 paper, Shop Management, he moved planning off the floor and into an office. A route clerk laid out each job’s path from machine to machine. An instruction card said how to do each step and how long it should take. Workers sent back written returns every day. That is a traveler.
1924· Western Electric
Between two limits
In May 1924, Walter Shewhart, an engineer at Western Electric, gave his boss a memo about a page long. A third of it was a drawing: measurements plotted between two limits. Inside the limits, leave the process alone. Outside them, something changed, so go find it. Shewhart showed that adjusting a machine after every bad part made the parts worse. Quality screens in MES software still draw his chart.
1952· MIT, Cambridge
Tape that runs a mill
In 1952, MIT’s Servomechanisms Laboratory showed a milling machine that took its orders from punched paper tape. The idea came from John Parsons, a Michigan contractor who made helicopter rotor blades, and the Air Force paid for the work. For the first time, the steps to cut a part lived outside the machinist’s head. In the 1970s, small computers moved inside the controls. That is computer numerical control, or CNC.
1959· Factory data collection
Clocking the job
Knowing what happened on the floor still meant reading handwriting. In 1959, IBM announced the 357, a data collection system for factories. A worker fed a badge and a job card into a station on the floor, and a clock added the time. The record went straight onto a punched card for the office computer. Supervisors got current status on each order. The traveler had started talking to the computer.
1968 to 1973· General Motors Hydramatic
Rungs instead of relays
In 1968, Dick Morley’s team at Bedford Associates built the Modicon 084 for General Motors’ Hydramatic division. It replaced cabinets of relays and wire with a program, drawn in rungs like the relay diagrams electricians already read. Change the line, change the program. By 1973, General Electric sold machine controls built around a small computer. The machines now ran on software. Their counts and their faults were still written on paper.
1952 to 1974· Troy, Ohio
A beep at the checkout
Joseph Woodland and Bernard Silver were granted a patent for the barcode in 1952. It took 22 years to reach a checkout. On June 26, 1974, at a Marsh supermarket in Troy, Ohio, a pack of Wrigley’s gum became the first product scanned by its Universal Product Code. Factories used the same trick. Print a code on the traveler, scan it at each step, and the computer knows which job moved, without anyone typing.
Around 1971· Japan
One number for a machine
In Japan, Seiichi Nakajima built total productive maintenance around one number. Nippondenso, a Toyota parts maker, is credited as the first plant to run it, around 1971, though some sources say the late 1960s. The number is overall equipment effectiveness, or OEE. How much of the planned time did the machine run? How fast, against its rated speed? How many parts were good? Multiply the three. Nakajima said many plants scored 50 percent or less.
1980 to 1990· Historians and screens
Every reading, saved
In 1980, Pat Kennedy founded the company that became OSIsoft. Its PI System, first built in 1983, saved every reading from a plant’s sensors with a timestamp, so an engineer could look back at any minute. In 1987, Dennis Morin and Phil Huber started Wonderware. Its InTouch software put a live picture of the plant on a Windows screen. The control room could now see the floor, and look back at it.
1990 to 1998· AMR Research and MESA
A name for the middle
Between the plan in the office and the machine on the floor sat the shift. In the early 1990s, analysts at AMR Research in Boston named its software: the manufacturing execution system. Some sources say 1990, others 1992. In 1997, the trade group MESA listed 11 things an MES does. Schedule the jobs. Dispatch them. Track labor, quality and maintenance. Trace each part’s history. Vendors like Consilium sold it to chip plants first.
1989 to 2005· Purdue and ISA-95
Drawing the levels
Next, engineers drew a map. At Purdue, Theodore Williams and an industry group built a reference model of the plant in the early 1990s. That work fed a standard. On May 15, 2000, ISA approved the first part of ISA-95. It drew the levels. Level 4, business planning. Level 3, manufacturing operations, where MES sits. Levels 2 to 0, control and the machines. In 2005, Part 3 spelled out level 3.
2004 to 2021· The vendors merge
Bigger systems
In 2004, MESA redrew its model to connect MES to everything around it: ERP, customers, suppliers, product design. The software grew to match, and the big automation companies bought the MES makers. Applied Materials had bought Consilium in 1998. Siemens agreed to buy Camstar in 2014. AVEVA closed its purchase of OSIsoft in 2021. Most MES was now sized and priced for large plants.
Today· Your shop
The whiteboard
Now walk a small job shop. A traveler rides with each job. Work orders sit in a tray. The schedule is on a whiteboard, and the person who keeps it is the system. Taylor’s route, Shewhart’s limits, the scan at each step, the OEE number: none of it needs a big plant. It needs one place where the quote, the job, the floor and the invoice meet. One you own.
Key dates
Where reputable sources disagree on a date or on who was first, the row says how.
| Year | Thread | What happened |
|---|---|---|
| 1881 | Paper on the floor | Taylor times the work at Midvale. Frederick Taylor starts time study at Midvale Steel in Philadelphia. Measuring how long each job should take becomes the base of his later system. Source |
| 1903 | Paper on the floor | Shop Management. Taylor’s paper to the mechanical engineers. A planning office lays out each job’s route from machine to machine, writes an instruction card for every operation, and collects daily written returns from the floor. Source |
| 1911 | Paper on the floor | The Principles of Scientific Management. Taylor’s best known book. Time study becomes the center of the system. Source |
| 1924 | Quality | Shewhart’s control chart. An internal memo dated May 16, 1924, about a page long, with a sketch of a chart between two limits. It separates ordinary variation from a real change in the process. Sources differ: Often credited to Bell Labs, which was formed in 1925; in 1924 Shewhart worked for Western Electric. One paper gives the date as May 24. Source |
| 1952 | Machine control | Numerical control at MIT. MIT’s Servomechanisms Laboratory shows a Cincinnati Hydrotel milling machine run from punched paper tape. The idea came from John Parsons; the US Air Force paid for the work. Source |
| 1952 | Data collection | The barcode patent. Joseph Woodland and Bernard Silver filed in 1949. The patent was granted on October 7, 1952. Their first design was a set of rings. Source |
| 1959 | Data collection | IBM 357 data collection. Announced in 1959, installed from 1960. Badge readers, card readers and clocks on the factory floor, feeding punched cards to the office. Source |
| 1968 | Machine control | The Modicon 084. Dick Morley’s team at Bedford Associates builds a programmable controller for General Motors Hydramatic. Relay panels start to become programs. Source |
| 1971 | Quality | TPM at Nippondenso. Seiichi Nakajima’s total productive maintenance is first applied at Nippondenso. Its yardstick is overall equipment effectiveness: availability times performance times quality. Sources differ: Sources date the first TPM and OEE work anywhere from the late 1960s to 1971. Source |
| 1973 | Machine control | CNC with a minicomputer. GE’s MC 8500 series, one of the first computer numerical controls on the market, is built around a PDP-8 minicomputer. Source |
| 1974 | Data collection | The first UPC scan. 8:01 a.m., June 26, 1974, at a Marsh supermarket in Troy, Ohio. A 10-pack of Wrigley’s Juicy Fruit gum, 67 cents. Source |
| 1980 | Data collection | The company that became OSIsoft. Pat Kennedy founds it in 1980. Its PI System, first built in 1983, stores every sensor reading with a timestamp. Sources differ: Sources give the first company name as Oil Systems or Oil Services. Source |
| 1987 | Data collection | Wonderware is founded. Dennis Morin and Phil Huber start the company. Its InTouch software puts a picture of the plant on a Windows screen. Sources differ: Sources date the first InTouch release to 1989, or to the Windows 3.0 launch in May 1990. Source |
| 1990 | MES software | MES gets its name. Analysts at AMR Research in Boston name the manufacturing execution system: the software between the plan and the machines. Sources differ: A University of Pretoria dissertation dates the term to 1990. Wikipedia and vendor sources say 1992. Source |
| 1992 | Standards | The Purdue reference model. Theodore Williams and an industry consortium at Purdue build PERA, the model of plant levels that ISA-95 later draws on. The consortium worked from 1989 to 1992. Sources differ: Sources place it in the early 1990s. None we found gives a single publication year. Source |
| 1997 | MES software | MESA’s 11 functions. The trade group MESA lists what an MES does: scheduling, dispatching, tracking, labor, quality, maintenance, data collection and more. Sources differ: Most sources say 1997, in MESA white papers from March and September of that year. Some say 1996. Source |
| 1998 | MES software | Applied Materials buys Consilium. Consilium’s WorkStream tracked production in chip plants. Applied Materials announced the deal in October 1998 and completed it that December. Source |
| 2000 | Standards | ISA-95 Part 1. Approved May 15, 2000. Level 4 is business planning, level 3 is manufacturing operations, levels 2 to 0 are control. Source |
| 2004 | MES software | MESA’s c-MES model. Published May 2004. MES is drawn connected to ERP, customers, suppliers, product design and compliance. Source |
| 2005 | Standards | ISA-95 Part 3. Models of manufacturing operations management: the activities at level 3, where MES sits. Source |
| 2014 | MES software | Siemens to buy Camstar. Announced October 2014. Camstar, founded in 1984 in Charlotte, North Carolina, sold MES to electronics, semiconductor and medical device plants. Source |
| 2021 | Data collection | AVEVA completes the OSIsoft purchase. Announced August 2020, completed March 19, 2021. Source |
Questions
Who coined the term MES?
Analysts at AMR Research in Boston. Sources date the term to 1990 or 1992.
What does an MES do?
In MESA’s 1997 list of 11 functions, an MES schedules and dispatches jobs, tracks labor, quality and maintenance, and traces each part’s history, among others. In a small shop the same work is done with travelers, a tray of work orders and a whiteboard.
What is ISA-95?
A standard from ISA, first approved in 2000, for how business systems and plant systems connect. It defines level 4 (business planning), level 3 (manufacturing operations, where MES sits) and levels 2 to 0 (control and the machines).
What is the difference between MES and ERP?
ERP plans the business: orders, purchasing, inventory and the books, usually by the day or the week. MES runs the shift: which job is on which machine, who ran it, and what came off the line.
What was the first PLC?
The Modicon 084, built in 1968 by Dick Morley’s team at Bedford Associates for General Motors’ Hydramatic division. It replaced cabinets of relays with a program drawn in rungs.
Sources
- Frederick W. Taylor, Encyclopaedia Britannica
- Shop Management (1903), F. W. Taylor, Marxists Internet Archive
- The Principles of Scientific Management, Wikipedia
- Walter A. Shewhart, Wikipedia
- History of numerical control, Wikipedia
- The history of the bar code, Smithsonian Magazine
- IBM 357, Wikipedia
- Programmable logic controller, Wikipedia
- Total productive maintenance, Wikipedia
- The 1970s, American Machinist
- Universal Product Code, Wikipedia
- OSIsoft, Wikipedia
- Wonderware, Wikipedia
- Manufacturing execution systems, University of Pretoria dissertation
- Purdue Enterprise Reference Architecture, Wikipedia
- An introduction to MES, Control.com
- Applied Materials to acquire Consilium, Applied Materials news release
- ANSI/ISA-95, Wikipedia
- MESA White Paper 8: Next Generation Collaborative MES Model
- Siemens to acquire Camstar, Digital Engineering 24/7
Read more
Running the loop across too many systems?
KoldOps builds the way a shop already runs into one system, quote to invoice, and hands over the code and the data. Tell us what you run today. Kol reads every message.
Write to us